Home Estimator

International Building Estimator — Option A
Sketch — Generic
Generic Building Plan

Inputs

i
Percent of plot area covered per floor (typical 50-70%).
i
Depth for excavation in inches (default 24 in = 2 ft).

Material Factors (editable)

Rates & Currency

Results — Summary

ItemQuantityNotes
Covered Area
Excavation
PCC (lean concrete)
Structural Concrete (m³)
Steel (kg)
Blocks (pieces)
Tiles / Marble (pieces)
Cement (bags) – Structure
Cement (bags) – Plaster
Electrical cable (m)
Plumbing pipe (m)
Total Estimated Cost
Plot area (m²)
Occupied footprint (sqft)
Concrete (m³) before wastage
Steel (kg) method
Estimates are indicative—adjust factors & rates to match local practice.

Scroll to Top