Footing Estimator — Structure Estimation
Sketch on top • Inputs left • Results right • Converter FAB
Sketch — Isolated
Inputs
i
RCC thickness (inches). For stepped/sloped, this is effective depth.
i
Extra depth for benching/working. Typical: 6 in.
i
Default wastage: 5% (applied to concrete volumes). Adjust if needed.
Steel & Rates
Results — Summary (Detailed)
| Item | Quantity | Rate | Cost |
|---|---|---|---|
| Excavation | — | — | — |
| PCC (blinding) | — | — | — |
| RCC (concrete) | — | — | — |
| Steel | — | — | — |
| Formwork (m²) | — | — | — |
| Total Estimated Cost | — | ||
RCC (ft³)
—
RCC (m³)
—
Mix
—
PCC (m³)
—
Excavation (m³)
—
Steel (kg)
—
Concrete Cost
—
Steel Cost
—
Formwork (m²)
—
Grand Total
—
Open the collapsible panes for complete breakdown. Change rates to match market prices.